U.S. Coast Guard Exams for Limited Engineering Officer Endorsements - Engineering Original-Raise of Grade & Renewal Examinations Details

limited engineer exams

The Chief Engineer Limited credential allows the holder to serve as Chief Engineer on vessels less than 1600 GRT on Ocean and Near Coastal waters and as Chief Engineer within horsepower limitations on vessels of any tonnage on Inland Waters. The credential can be endorsed for Oceans or Near Coastal.

Assistant Engineer (Limited), steam and motor vessels, on vessels of any horsepower and any gross tons on Inland Waters, and on vessels of not more than 1600 gross tons.

A Designated Duty Engineer (DDE) may serve as a Chief Engineer on domestic vessels of not more than 500grt. The 1000hp and 4000hp DDE credentials are valid only on near coastal and inland waters and the unlimited horsepower level is valid on any waters.

Chief engineer and assistant engineer OSV work in offshore supply vessels and have separate examination requirements.

ships engineer uscg

You may also read: USCG License Requirements



A mariner seeking an original national endorsement or raise of grade based on training or service started on or after March 24, 2014, will be examined under the requirements of the final rule published by the Coast Guard on December 24, 2013, (78 FR 77796) . Those who started before March 24, 2014, will be examined under the regulations and policy in effect before that date unless they have specifically requested to examine for their endorsement under the final rule 78 FR 77796.

Chief Engineer Limited - Steam / Motor / Gas Turbine - Original / Raise of Grade Exams

chief engineer limited exams
Table: Chief Engineer Limited Exam Details Credits: USCG 

  • Raise of Grade from Assistant Engineer Limited to Chief Engineer Limited - All of the above required
  • From Motor and/or Gas Turbine to Steam, Motor, and/or Gas Turbine Plants - Q605 Steam Plants required
  • From Steam and/or Gas Turbine to Motor, Steam, and/or Gas Turbine Plants - Q602 Motor Plants required
  • From Steam and/or Motor to Gas Turbine, Steam, and/or Motor Plants - Q606  Gas Turbine Plants required

Assistant Engineer Limited - Steam / Motor / Gas Turbine - Original / Raise of Grade Exams

assistant engineer limited exams
Table: Assistant Engineer Limited Exam Details Credits: USCG 

  • From Motor and/or Gas Turbine to Steam, Motor, and/or Gas Turbine Plants - Q611 Steam Plants required
  • From Steam and/or Gas Turbine to Motor, Steam, and/or Gas Turbine Plants - Q610 Motor Plants required
  • From Steam and/or Motor to Gas Turbine, Steam, and/or Motor Plants - Q612 Gas Turbine Plants required

DDE Unlimited HP - Motor / Gas Turbine - Original / Increase in Scope Exams

dde unlimited hp exams
Table: DDE Unlimited HP Exam Details Credits: USCG 

  • From DDE 1000 HP/4000 HP to DDE Unlimited HP - All of the above required
  • From Gas Turbine to Motor & Gas Turbine Plants - Q620 Motor Plants required
  • From Motor to Gas Turbine & Motor Plants - Q622 Gas Turbine Plants required


DDE 1000/4000 HP - Motor / Gas Turbine - Original Exams

dde 1000 4000 hp exams
Table: DDE 1000/4000 HP Exam Details Credits: USCG 

  • From Gas Turbine to Motor & Gas Turbine Plants - Q630 Motor Plants required
  • From Motor to Gas Turbine & Motor Plants - Q632 Gas Turbine Plants required

Chief Engineer OSV - Motor - Original / Raise of Grade Exams

chief engineer osv motor exams
Table: Chief Engineer OSV Exam Details Credits: USCG

  • An applicant increasing in scope from CE, OSV-4000 HP to CE, OSV Unlimited HP may do so without further examination
  • Raise of Grade from Assistant Engineer, OSV to Chief Engineer, OSV - All of the above required

Assistant Engineer OSV - Motor - Original Exams

asst engineer osv motor exams
Table: Assistant Engineer OSV Exam Details Credits: USCG

  • An applicant increasing scope from AE-OSV, 4000 HP to AE-OSV, Unlimited HP may do so without further examination

Limited Engineering Officer Renewal Exercises

Renewal exercises are open book exercises issued to the mariner by the Regional Exam Centers. It is recommended that completed exercises be returned to the Regional Exam Center for scoring within thirty days in order to assure the examination cycle, including retakes, is completed within ninety days. In no case will a renewal exercise be accepted if returned, based on the postmark date, more than 90 days from the original mailing date.

A mariner submitting an application for renewal must take the renewal modules associated with each mode of propulsion being renewed

Steam Plants Renewal Exercises

steam plants renewal
Table: Steam Plants Renewal Exercises Credits: USCG

Motor Plants Renewal Exercises

motor plants renewal
Table: Motor Plants Renewal Exercises Credits: USCG

Gas Turbine Plants Renewal Exercises

gas turbine plants renewal
Table: Gas Turbine Renewal Exercises Credits: USCG

Disclaimer: For general information purpose only. Please check with USCG for the accurate and latest information